Building Design in a Sugar Factory: Replacement of Filter Presses

Building design, structural engineering and installation concept for modifications in an existing industrial facility

For a sugar factory, INOPCO planned the structural replacement of existing filter presses with new equipment components with significantly different geometry and mass. The focus was on load transfer in the existing structure, strengthening of level +7.00, redesign of the installation level and safe installation via temporary roof openings.

  • Building design and structural engineering in an existing industrial facility
  • Existing/new load comparison for the main structure, columns, foundations and connection points
  • Execution planning, steel structure design, shell construction planning and bills of quantities
  • Planning of temporary construction stages for installation via roof openings
Discuss a Similar Project
Building design for filter presses in a sugar factory

Project Profile

Industry

Sugar industry

Project Type

Modification of existing facility

Focus

Building and structural design

Level

+7.00 m

Initial Situation

Several existing filter presses were to be replaced by new equipment. Since the new units differed significantly from the existing equipment in terms of geometry and mass, the load-bearing capacity of the existing main structure had to be assessed and the installation level structurally adapted.

1. Assess Existing Structure

Review of existing documentation, on-site verification and assessment of the existing reinforced concrete and steel structure.

2. Verify Loads

Existing/new load comparison for columns, foundations, steel beams, steel connections and level +7.00.

3. Plan Modification

Redesign of the installation level, new support frames, strengthening from below and an installation concept for the temporary construction stage.

Existing new load comparison and steel structure design for a sugar factory

Technical Planning Task

Minimal intervention in the existing structure, maximum safety for modification and installation

The new filter presses were to be installed on the existing level +7.00. The objective was to develop a solution with as few structural interventions in the existing facility as possible. Since the structural assessment of the existing platform initially did not confirm sufficient load-bearing capacity, strengthening of the level from below was incorporated into the planning.

Structural Engineering

Auditable structural calculations, continuation of the existing structural documentation, recalculation of the reinforced concrete slab and steel structure.

Steel Structure and Shell Construction

Execution drawings, shell construction drawings and workshop plans for new steel support frames and strengthening measures.

Tender Documents

Specifications and bills of quantities for shell construction, steel construction and roofing works, including quantity take-off.

Installation Stage

Verification of temporary modifications to the roof structure and coordination of an installation concept for equipment handling and structural strengthening.

Building Design

Execution planning with detailed information for strengthening level +7.00, detail and construction drawings, coordination of specialist project participants and documentation.

  • Execution planning
  • Detail drawings
  • Bills of quantities
  • Bid comparison and award recommendation

Structural Engineering

Existing structure assessment, load comparison, auditable structural calculations, redesign of new support frames and planning of steel frames for strengthening the platform.

  • Existing / new load comparison
  • Recalculation of existing structure
  • Steel support frames and opening reinforcements
  • Execution drawings for steel and shell construction

Temporary Construction Stage

Planning of temporary modifications to the existing roof structure and installation concept for removing the existing and bringing in the new filter press units.

  • Roof openings for installation
  • Temporary structural verifications
  • Roof installation concept
  • Strengthening installation concept

Planning in an Operating Production Environment

Modification planning with existing structure constraints, installation sequence and equipment interfaces

The project required close integration of building design, structural engineering and equipment planning. For the new filter presses, machine layout plans, interface forces, dynamic factors, existing structural calculations, workshop and installation drawings as well as operational information had to be taken into account.

Planning objective: The existing building structure was to be used as far as possible and selectively strengthened in order to enable replacement of the process equipment with minimal intervention in the existing facility.
Installation concept with roof opening for filter presses in a sugar factory

Are you planning modifications in an existing production facility?

INOPCO supports industrial clients with building design, structural engineering, execution planning, steel structure design, tender documents and installation concepts for existing industrial facilities.