Industrial Building Design for Production Facilities and Industrial Sites
From feasibility and concept design through approval planning to execution-ready detailed designINOPCO provides building design for industrial buildings, production facilities, technical extensions and structural plant environments. The focus is on new-build, conversion and extension projects where the building, structural design, MEP, plant design, approval requirements and operations must be coordinated.
From Leipzig, we support projects in Saxony, Central Germany and throughout Germany. The objective is a coordinated design basis that connects approvals, tendering and technical implementation.
Discuss Your Industrial Project
What Does Industrial Building Design Cover?
Industrial building design combines building design with operator requirements, structural engineering, MEP, plant design and approval requirements. The scope is tailored to the project phase and technical interfaces.
For Which Projects?
For production buildings, process and technical areas, conversions of existing facilities, extensions, silos, steel structures, foundations and other structural environments at industrial sites.
What Is the Result?
Coordinated design documents, aligned interfaces and a reliable basis for approvals, detailed design, tendering, procurement and implementation.
From Project Brief to Implementation-Ready Design
Industrial building design as an integrated process throughout the project1. Feasibility & Concept Design
Site, existing conditions, use, plant layout, utilities, access and approval requirements are combined into a robust concept design basis.
2. Approval Planning
The concept design is developed into coordinated permit drawings, technical descriptions and verification structures for the approval procedure. Depending on the authority and federal state, we can also submit the documents digitally.
Learn More3. Detailed Design
Approved and coordinated design information is developed into execution-ready drawings, details, connections and technical specifications.
Learn More4. Structural Design & Construction
Loads, foundations, steelwork, structural works and construction details are coordinated with the building, existing structures and plant environment.
Learn more5. Tendering & Procurement
Quantities, specifications and tender documents are prepared on the basis of coordinated design information.
6. Implementation
Document status, approvals, changes and technical queries are managed systematically through implementation.
Which Design Documents Are Produced?
Concrete deliverables instead of abstract service termsDesign and Approval Documents
- Site plans, floor plans, sections and elevations
- General arrangement and detail drawings appropriate to the project phase
- Technical descriptions and coordinated drawing revisions
- Documents for building permit applications and further approval interfaces
Detailed Design and Coordination Documents
- Structural works, steelwork and construction detail documents as required by the project
- Formwork and reinforcement drawings where included in the scope
- Connections to existing structures, openings, foundations and installation situations
- Quantity and tender bases as well as BIM/IFC data depending on the project
Industrial Building Design Is Interface Planning
Building design must integrate plant, operations and specialist disciplinesIn industrial projects, the building itself does not determine the design alone. Plant layout, structural engineering, MEP, utilities, fire protection, logistics, operator requirements and approval conditions all influence geometry, construction and the design process.
INOPCO coordinates these interfaces so that all specialist disciplines work from common design information and changes are traceably incorporated into the relevant document revisions.
- Architecture and building design
- Structural engineering, steelwork and foundations
- MEP, utilities and plant connections
- BImSchG, GEG, AwSV/WHG and fire protection as project-specific interfaces
Planning for Existing Facilities and Brownfield Projects
Conversions and extensions under existing structural and operational constraintsFor existing facilities, building design starts with the current situation. Existing structures, plant, utilities, access conditions and production processes define the available solution space and must be reliably assessed before intervention.
Typical tasks include roof and wall openings, new platforms and foundations, load changes, steelwork strengthening, integration of new equipment and structural modifications during ongoing production or short shutdown windows.
View Existing-Facility ReferenceApproval Planning and Detailed Design
Two distinct design phases within industrial building designApproval Planning: Achieving Approval Readiness
The coordinated concept design is developed into permit-ready drawings and verifications. INOPCO coordinates the building permit application, specialist disciplines and authority requirements for industrial new-build, conversion and extension projects.
Learn MoreDetailed Design: Making the Design Execution-Ready
Approved and coordinated design information is developed into execution-ready drawings, details and connections. In industrial environments, the focus is on existing conditions, structural engineering, MEP, steelwork and interfaces with plant design.
Learn MoreTypical Industrial Building Design Projects
New-builds, extensions and technical integration in industrial plant environmentsProduction Buildings
Building envelopes, technical areas, foundations, utility rooms, steel structures and structural works for new or expanded production facilities.
Process & Technical Areas
Control rooms, laboratory areas, distribution stations, technical rooms and structural interfaces with process equipment.
Silos & Conveying Systems
Silos, conveyor bridges, foundations, pipe penetrations and structural integration of new conveying and plant equipment.
Conversions & Extensions
Connections to existing structures, roof openings, platforms, strengthening and structural modifications at existing production sites.
Selected Building Design References
Practical examples with specific design scope
BImSchG New Production Facility
Architecture, approval planning, structural engineering and detailed design for a new production facility.
View Reference
Biorefinery in Saxony-Anhalt
Building permit application, authority coordination, building design, structural engineering and detailed design for a complex industrial project.
View Reference
Grain Silo Expansion
Building permit documents, approval structural design, detailed design, formwork and reinforcement planning, and tender documents.
View Reference
Sugar Factory Filter Press Replacement
Building design, load comparison, steelwork strengthening and installation concept for replacing filter presses in an existing facility.
View Reference